{"id":24352,"date":"2022-09-29T22:40:08","date_gmt":"2022-09-30T03:40:08","guid":{"rendered":"https:\/\/projectcalls.com\/dev?p=24352"},"modified":"2022-09-29T12:04:06","modified_gmt":"2022-09-29T17:04:06","slug":"debarment-of-contractors-and-suppliers","status":"publish","type":"post","link":"https:\/\/projectcalls.com\/dev\/debarment-of-contractors-and-suppliers\/","title":{"rendered":"Debarment of contractors and suppliers"},"content":{"rendered":"<p>Guyana<\/p>\n<p>The award of the contract in the sum of $566.9 million to Kares Engineering Inc. for reconstruction of the North Ruimveldt Secondary School has generated much criticism. The company was the third lowest from among nine tenders received. According to the National Procurement and Tender Administration Board (NPTAB), the two lower tenders were deemed non-responsive, making Kares Engineering the lowest responsive tender. However, by Section 39(2) of the Procurement Act, a procurement contract must be awarded to the lowest evaluated tender and not lowest responsive tender.<\/p>\n<p><strong>Lowest evaluated tender versus lowest responsive tender<\/strong><\/p>\n<p>The Act does not provide a definition as to what constitutes the lowest evaluated tender. However, following the bid opening ceremony, the procuring entity (Ministry, Department or Region) must transmit to the appointed Evaluation Committee all tenders received from contractors or suppliers. The Committee shall evaluate the tenders using only those criteria outlined in the tender documents, which have to be qualified in monetary terms, in addition to prices.<span id=\"more-682428\"><\/span><\/p>\n<p>Evaluators normally use a two-step approach when conducting evaluations, and this approach is supported by the Procurement Act. The first is an assessment of the responsiveness of the tenders which is a non-technical evaluation. This involves checking to ensure that all the documents listed in the solicitation request have been included in the tender submission, in addition to assessing whether the tenderers have met the qualification requirements set out in Section 5 of the Act. The latter includes ensuring that:<\/p>\n<p>Obligations to pay taxes and social security contributions of employees have been fulfilled;<\/p>\n<p>There is no disqualification, debarment or suspension over the last three years in Guyana and elsewhere;<\/p>\n<p>A tender is still considered responsive if \u2018it contains minor deviations that do not materially alter or depart from the characteristics, terms, conditions and other requirements set forth in the solicitation documents or if it contains errors or oversights that are capable of being corrected without touching on the substance of the tender\u2019.<\/p>\n<p>As Quantity Surveyor, Donald Rodney pointed out in a recent letter to the Editor:<\/p>\n<p>Responsiveness refers to deliverables, being documentation NPTAB expressly requires of all intended bidders.\u00a0The responsiveness test is best seen by readers as a procedural pre-evaluation review of submitted bids to screen out bids which do not have the deliverables required, carried out to facilitate the speedy execution of substantial evaluation of bids\u2026The responsiveness test should be done on a fail or pass basis, with \u2018failed bids\u2019 being set aside and taking no part in the substantive evaluation, whatsoever.<\/p>\n<p>In the second stage, the evaluators proceed with the technical evaluation of only tenders that are considered responsive. This involves assessment against the criteria set out in the tender documents which have to be quantified in monetary terms using a combination of points and weightings, including prices. A key criterion relates to the possession of, or having access to, the technical competence, financial resources, equipment and other physical facilities, managerial capability, reliability, experience, and reputation, and the personnel, to perform the contract. The tender that receives the highest score based on the technical evaluation is considered the lowest evaluated tender.<\/p>\n<p>There is legal capacity to enter into the contract;<\/p>\n<p>There is no evidence of insolvency, receivership or bankruptcy etc.;<\/p>\n<p>Directors or officers have not been convicted of any criminal offence relating to\u00a0 professional conduct or the making of false statements or misrepresentations as to\u00a0 qualifications to enter into a procurement contract within a period of ten years preceding the commencement of the procurement proceedings; and<\/p>\n<p>Past performance substantiated by documentary evidence would commend the tenderers for serious consideration for the award of the contract.<\/p>\n<p>\u00a0<\/p>\n<p><a href=\"https:\/\/www.stabroeknews.com\/2022\/09\/12\/features\/accountability-watch\/debarment-of-contractors-and-suppliers\/\" target=\"_blank\" rel=\"noopener\">more\u00a0<\/a><\/p>\n<p>\u00a0<\/p>\n<p>Image: pexels-dids-5499557<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Guyana The award of the contract in the sum of $566.9 million to Kares Engineering Inc. for reconstruction of the North Ruimveldt Secondary School has generated much criticism. The company&#8230;<\/p>\n","protected":false},"author":1091,"featured_media":24353,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"nf_dc_page":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[250],"tags":[190,116,125],"class_list":["post-24352","post","type-post","status-publish","format-standard","has-post-thumbnail","category-articles","tag-construction","tag-guyana","tag-public-procurement"],"aioseo_notices":[],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/09\/pexels-dids-5499557-scaled-e1664470780222.jpg?fit=1024%2C616&ssl=1","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p6u9Qa-6kM","jetpack_likes_enabled":true,"jetpack-related-posts":[{"id":24585,"url":"https:\/\/projectcalls.com\/dev\/ministry-nptab-cabinet-all-at-fault-over-kares-contract-goolsarran\/","url_meta":{"origin":24352,"position":0},"title":"Ministry, NPTAB, Cabinet all at fault over Kares contract \u2013 Goolsarran","author":"Mayra Bonilla Lopez","date":"October 13, 2022","format":false,"excerpt":"Guyana Former Auditor General Anand Goolsarran says the Ministry of Education, the national tender board and Cabinet all failed in their duty to the public by not acting to stop Kares Engineering Inc from securing a $566.9m North Ruimveldt Secondary School contract considering its previous poor performance on an even\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/10\/pexels-cottonbro-5185078-scaled-e1682644109523.jpg?fit=1025%2C730&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/10\/pexels-cottonbro-5185078-scaled-e1682644109523.jpg?fit=1025%2C730&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/10\/pexels-cottonbro-5185078-scaled-e1682644109523.jpg?fit=1025%2C730&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/10\/pexels-cottonbro-5185078-scaled-e1682644109523.jpg?fit=1025%2C730&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":35260,"url":"https:\/\/projectcalls.com\/dev\/jagdeo-hints-at-countrywide-prequalification-system-for-procurement\/","url_meta":{"origin":24352,"position":1},"title":"Jagdeo hints at countrywide prequalification system for procurement","author":"Mayra Bonilla Lopez","date":"July 18, 2024","format":false,"excerpt":"Guyana \u00a0 Vice President Bharrat Jagdeo yesterday stated that the strengthening of the procurement system will be continuing in the form of a countrywide prequalifying system allowing the Cabinet to have a full picture about companies bidding for projects. Homing in on the procurement process at his weekly press conference\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2017\/09\/street-building-construction-industry-Life-Of-Pix-Pexels-e1680228669939.jpg?fit=1023%2C682&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2017\/09\/street-building-construction-industry-Life-Of-Pix-Pexels-e1680228669939.jpg?fit=1023%2C682&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2017\/09\/street-building-construction-industry-Life-Of-Pix-Pexels-e1680228669939.jpg?fit=1023%2C682&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2017\/09\/street-building-construction-industry-Life-Of-Pix-Pexels-e1680228669939.jpg?fit=1023%2C682&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":36667,"url":"https:\/\/projectcalls.com\/dev\/guyana-news-ppc-rejected-complaint-over-contract-for-fort-wellington-school-extension\/","url_meta":{"origin":24352,"position":2},"title":"Guyana News PPC rejected complaint over contract for Fort Wellington school extension","author":"Mayra Bonilla Lopez","date":"October 10, 2024","format":false,"excerpt":"Guyana The Public Procurement Commission (PPC) last December rejected a complaint by a bidder over the award of a project for the extension of the Fort Wellington Secondary School but the procuring entity, the Ministry of Local Government never provided any of the requested information for the investigation. Bickram Motiram\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/03\/Business-Office-Contract-Agreement-Deal-rawpixel-Pixabay.jpg?fit=1024%2C682&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/03\/Business-Office-Contract-Agreement-Deal-rawpixel-Pixabay.jpg?fit=1024%2C682&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/03\/Business-Office-Contract-Agreement-Deal-rawpixel-Pixabay.jpg?fit=1024%2C682&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/03\/Business-Office-Contract-Agreement-Deal-rawpixel-Pixabay.jpg?fit=1024%2C682&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":24359,"url":"https:\/\/projectcalls.com\/dev\/nptab-defends-school-contract-award-to-kares\/","url_meta":{"origin":24352,"position":3},"title":"NPTAB defends school contract award to Kares","author":"Mayra Bonilla Lopez","date":"September 29, 2022","format":false,"excerpt":"Guyana -says it was lowest responsive bid The National Procurement and Tender Administration Board (NPTAB) yesterday defended\u00a0 the award of the reconstruction of the North Ruimveldt Secondary School to Kares Engineer-ing Inc, stating that it was the lowest responsive bid. On August 24, the $566.9 million contract was signed by\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/09\/pexels-pixabay-256417-scaled-e1664471205531.jpg?fit=1023%2C570&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/09\/pexels-pixabay-256417-scaled-e1664471205531.jpg?fit=1023%2C570&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/09\/pexels-pixabay-256417-scaled-e1664471205531.jpg?fit=1023%2C570&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/09\/pexels-pixabay-256417-scaled-e1664471205531.jpg?fit=1023%2C570&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":18795,"url":"https:\/\/projectcalls.com\/dev\/tender-board-denies-making-call-to-retender-ndias-steel-sheets-contract-2\/","url_meta":{"origin":24352,"position":4},"title":"Tender board denies making call to retender NDIA\u2019s steel sheets contract","author":"Mayra Bonilla Lopez","date":"October 7, 2021","format":false,"excerpt":"Guyana The National Procurement and Tender Administration Board (NPTAB) yesterday distanced itself from a decision to retender a contract, as claimed by the Ministry of Agriculture, and its Board will meet next week to discuss the issue. An NPTAB official said that the Board will want to clarify its role,\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/10\/pexels-andrea-piacquadio-3760067-scaled.jpg?fit=1200%2C800&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/10\/pexels-andrea-piacquadio-3760067-scaled.jpg?fit=1200%2C800&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/10\/pexels-andrea-piacquadio-3760067-scaled.jpg?fit=1200%2C800&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/10\/pexels-andrea-piacquadio-3760067-scaled.jpg?fit=1200%2C800&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/10\/pexels-andrea-piacquadio-3760067-scaled.jpg?fit=1200%2C800&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":20656,"url":"https:\/\/projectcalls.com\/dev\/the-guardians-of-democracy-can-be-the-guardians-against-corruption\/","url_meta":{"origin":24352,"position":5},"title":"The guardians of democracy can be the guardians against corruption","author":"Mayra Bonilla Lopez","date":"February 10, 2022","format":false,"excerpt":"Guyana It is with great worry that, once again, the situation regarding Guy-ana\u2019s public procurement practices must once again be addressed and criticized. The entity in question is the National Procurement and Tender Administration Board (NPTAB), whose members are in charge of all public procurement in the country. Since this\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/05\/pexels-cqfavocat-613508-scaled-e1644524566827.jpg?fit=1025%2C684&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/05\/pexels-cqfavocat-613508-scaled-e1644524566827.jpg?fit=1025%2C684&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/05\/pexels-cqfavocat-613508-scaled-e1644524566827.jpg?fit=1025%2C684&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/05\/pexels-cqfavocat-613508-scaled-e1644524566827.jpg?fit=1025%2C684&ssl=1&resize=700%2C400 2x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts\/24352","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/users\/1091"}],"replies":[{"embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/comments?post=24352"}],"version-history":[{"count":1,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts\/24352\/revisions"}],"predecessor-version":[{"id":24354,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts\/24352\/revisions\/24354"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/media\/24353"}],"wp:attachment":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/media?parent=24352"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/categories?post=24352"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/tags?post=24352"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}