{"id":32023,"date":"2024-01-11T23:17:26","date_gmt":"2024-01-12T04:17:26","guid":{"rendered":"https:\/\/projectcalls.com\/dev?p=32023"},"modified":"2024-01-15T11:40:48","modified_gmt":"2024-01-15T16:40:48","slug":"jamaican-utility-launches-solar-plus-storage-wind-project-tender","status":"publish","type":"post","link":"https:\/\/projectcalls.com\/dev\/jamaican-utility-launches-solar-plus-storage-wind-project-tender\/","title":{"rendered":"Jamaican utility launches solar-plus-storage, wind project tender"},"content":{"rendered":"<p>Jamaica<\/p>\n<p>Jamaica Public Service Company Limited (JPS) is inviting applications for engineering, procurement and construction services of a 115 MW utility-scale solar plant, 171.5 MWh battery energy storage system and 12 MW wind plant at unspecified locations at unspecified locations in the Caribbean country.<\/p>\n<p>Last week the country\u2019s state-owned utility company\u00a0<a tabindex=\"0\" href=\"https:\/\/www.pv-magazine.com\/2023\/09\/19\/jamaica-seeks-proposals-for-100-mw-of-renewables\/\" target=\"_blank\" rel=\"noopener\">JPS<\/a>\u00a0announced it is looking for applications for a range of auctioned solar, battery and wind projects.<\/p>\n<p>Projects consist of a 115 MW utility-scale solar plant expected to produce 237.5 GWh per annum, more than three battery energy storage systems producing 1 to 50 MW \u2013 consisting of 171.5 MWh in total \u2013 at a minimum of three locations, and a 12 MW onshore wind facility to produce 35.7 GWh per annum, according to the\u00a0<a tabindex=\"0\" href=\"https:\/\/cdn.carilec.org\/file\/2023\/12\/Request-for-Expression-of-Interest-968225.pdf\">tender documents<\/a>.<\/p>\n<p>The PV facility can have fixed or tracking structures.<\/p>\n<p>The PV facility and two of the three battery energy storage systems are expected to start operating in the fourth quarter of 2026, while the third battery energy storage system is slated for commercialization for the third quarter of 2027 and the onshore wind project is tipped for the fourth quarter of 2027. Locations are yet to be finalized.<\/p>\n<p>Energy produced by the projects will be sold and delivered to JPS on an energy tariff basis, JPS said. Procurements will be assessed on a levelized cost of electricity (LCOE) basis and should be \u201coptimized\u201d accordingly, the company said.<\/p>\n<div class=\"disclaimer\"><\/div>\n<div><a href=\"https:\/\/www.pv-magazine.com\/2023\/12\/07\/jamaican-utility-launches-solar-plus-storage-wind-project-tender\/\" target=\"_blank\" rel=\"noopener\">more<\/a><\/div>\n<p>\u00a0<\/p>\n<p><em>Image: pexels-hoan-ngo\u0323c<\/em><\/p>\n<p>\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Jamaica Jamaica Public Service Company Limited (JPS) is inviting applications for engineering, procurement and construction services of a 115 MW utility-scale solar plant, 171.5 MWh battery energy storage system and&#8230;<\/p>\n","protected":false},"author":1091,"featured_media":16287,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"nf_dc_page":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[250],"tags":[244,124],"class_list":["post-32023","post","type-post","status-publish","format-standard","has-post-thumbnail","category-articles","tag-electricity-energy","tag-jamaica"],"aioseo_notices":[],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/04\/pexels-hoan-ngo%CC%A3c-6961112-scaled-e1675363854180.jpg?fit=1024%2C683&ssl=1","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p6u9Qa-8kv","jetpack_likes_enabled":true,"jetpack-related-posts":[{"id":25990,"url":"https:\/\/projectcalls.com\/dev\/guyana-launches-tender-for-33-mw-34-mwh-of-solar-plus-storage\/","url_meta":{"origin":32023,"position":0},"title":"Guyana launches tender for 33 MW\/34 MWh of solar-plus-storage","author":"Michele Marius","date":"January 19, 2023","format":false,"excerpt":"Guyana The government of Guyana and the Inter\u2013American Development Bank (IDB) have jointly launched a tender to deploy 33 MW\/34 MWh of solar-plus-storage capacity. The Guyanese authorities said the tender will be divided into three lots. It will enable the selection of eight PV projects, the government said, without disclosing\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/07\/Solar-panels-wind-mill-energy-electricity-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/07\/Solar-panels-wind-mill-energy-electricity-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/07\/Solar-panels-wind-mill-energy-electricity-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/07\/Solar-panels-wind-mill-energy-electricity-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":36024,"url":"https:\/\/projectcalls.com\/dev\/guyana-opens-tender-for-solar-plus-storage-projects-2\/","url_meta":{"origin":32023,"position":1},"title":"Guyana opens tender for solar-plus-storage projects","author":"Mayra Bonilla Lopez","date":"August 29, 2024","format":false,"excerpt":"Guyana Guyana Power and Light, a publicly owned utility, has kicked off a tender to select an engineering, procurement and construction (EPC) contractor for three solar plants with battery energy storage. The deadline for applications is Sept. 26. Guyana Power and Light has launched a tender for an EPC contractor\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/08\/pexels-cristian-rojas-8853536-1-scaled-e1723773146795.jpg?fit=1024%2C684&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/08\/pexels-cristian-rojas-8853536-1-scaled-e1723773146795.jpg?fit=1024%2C684&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/08\/pexels-cristian-rojas-8853536-1-scaled-e1723773146795.jpg?fit=1024%2C684&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/08\/pexels-cristian-rojas-8853536-1-scaled-e1723773146795.jpg?fit=1024%2C684&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":35775,"url":"https:\/\/projectcalls.com\/dev\/guyana-opens-tender-for-solar-plus-storage-projects\/","url_meta":{"origin":32023,"position":2},"title":"Guyana opens tender for solar-plus-storage projects","author":"Mayra Bonilla Lopez","date":"August 15, 2024","format":false,"excerpt":"Guyana Guyana Power and Light, a publicly owned utility, has kicked off a tender to select an engineering, procurement and construction (EPC) contractor for three solar plants with battery energy storage. The deadline for applications is Sept. 26. Guyana Power and Light has launched a tender for an EPC contractor\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/08\/pexels-pixabay-356036-scaled-e1723773103381.jpg?fit=1025%2C674&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/08\/pexels-pixabay-356036-scaled-e1723773103381.jpg?fit=1025%2C674&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/08\/pexels-pixabay-356036-scaled-e1723773103381.jpg?fit=1025%2C674&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/08\/pexels-pixabay-356036-scaled-e1723773103381.jpg?fit=1025%2C674&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":6131,"url":"https:\/\/projectcalls.com\/dev\/domrep-solar-wind-opportunities-take-shape\/","url_meta":{"origin":32023,"position":3},"title":"DomRep solar, wind opportunities take shape","author":"Michele Marius","date":"July 5, 2018","format":false,"excerpt":"Two energy projects in the Caribbean island pen funding agreements, underscoring appetite for renewable power sources Two renewable energy project developers in the Dominican Republic advanced financing plans this week, securing debt for solar and wind-powered projects on the Caribbean island. Taiwanese General Energy Solutions, or GES, secured $38m in\u2026","rel":"","context":"In &quot;News\/Developments&quot;","block_context":{"text":"News\/Developments","link":"https:\/\/projectcalls.com\/dev\/category\/newsdevelopments\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/07\/Solar-panels-wind-mill-energy-electricity-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/07\/Solar-panels-wind-mill-energy-electricity-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/07\/Solar-panels-wind-mill-energy-electricity-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/07\/Solar-panels-wind-mill-energy-electricity-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":27319,"url":"https:\/\/projectcalls.com\/dev\/editorial-clarity-before-renewables-bid\/","url_meta":{"origin":32023,"position":4},"title":"Editorial | Clarity before renewables bid","author":"Mayra Bonilla Lopez","date":"April 13, 2023","format":false,"excerpt":"Jamaica The Government\u2019s announcement that it will next month go to market for 200 megawatts (MW) of renewable electricity generation capacity is welcome after the several hiccups and delays in its renewable programme. However, there are several issues that require clarity from the energy minister, Daryl Vaz, before the Generation\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/01\/power-poles-upper-lines-power-lines-high-voltage-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/01\/power-poles-upper-lines-power-lines-high-voltage-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/01\/power-poles-upper-lines-power-lines-high-voltage-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/01\/power-poles-upper-lines-power-lines-high-voltage-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=700%2C400 2x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts\/32023","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/users\/1091"}],"replies":[{"embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/comments?post=32023"}],"version-history":[{"count":2,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts\/32023\/revisions"}],"predecessor-version":[{"id":32090,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts\/32023\/revisions\/32090"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/media\/16287"}],"wp:attachment":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/media?parent=32023"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/categories?post=32023"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/tags?post=32023"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}