{"id":33957,"date":"2024-05-02T23:36:22","date_gmt":"2024-05-03T04:36:22","guid":{"rendered":"https:\/\/projectcalls.com\/dev?p=33957"},"modified":"2024-05-02T18:57:32","modified_gmt":"2024-05-02T23:57:32","slug":"chinese-consortium-lands-us38mn-guyana-solar-contract","status":"publish","type":"post","link":"https:\/\/projectcalls.com\/dev\/chinese-consortium-lands-us38mn-guyana-solar-contract\/","title":{"rendered":"Chinese consortium lands US$38mn Guyana solar contract"},"content":{"rendered":"<p>Guyana<\/p>\n<p><a href=\"https:\/\/www.bnamericas.com\/en\/company-profile\/guyana-power--light-inc\" target=\"_blank\" rel=\"noopener\">Guyana Power and Light<\/a>\u00a0has awarded work for utility-scale solar capacity and associated battery energy storage program Guysol.<\/p>\n<p>The winner of the 18-month contract was a consortium of Chinese companies\u00a0<a href=\"https:\/\/www.bnamericas.com\/en\/company-profile\/sumec-group-corporation\" target=\"_blank\" rel=\"noopener\">Sumec<\/a>\u00a0and XJ Group, procurement information shows.<\/p>\n<p>BNamericas previously reported that eight groups\u00a0<a href=\"https:\/\/www.bnamericas.com\/en\/news\/asian-groups-flock-to-guyana-utility-scale-solar-storage-call\" target=\"_blank\" rel=\"noopener\">had submitted offers<\/a>\u00a0in the call for eight plants in three lots and a combined 33MWp. The tender was launched\u00a0<a href=\"https:\/\/www.bnamericas.com\/en\/news\/guyana-embarks-on-utility-scale-solar-storage-path-with-call-for-bids\" target=\"_blank\" rel=\"noopener\">in December 2022<\/a>.<\/p>\n<p>The joint venture picked up lots two and three to build the infrastructure in the areas of Linden and Essequibo, specifically, five plants for lot two (US$19.3mn) and energy storage for lot three (US$18.6mn). Additional information was not disclosed.<\/p>\n<p>Funds from the Norwegian Agency for Development Cooperation and administered by\u00a0<a href=\"https:\/\/www.bnamericas.com\/en\/company-profile\/inter-american-development-bank-iadb----banco-interamericano-de-desarrollo-bid\" target=\"_blank\" rel=\"noopener\">IDB<\/a>\u00a0are being used to finance Guysol, project summaries for which were released by Guyana\u2019s\u00a0<a href=\"https:\/\/www.bnamericas.com\/en\/company-profile\/environmental-protection-agency-epa\" target=\"_blank\" rel=\"noopener\">Environmental Protection Agency<\/a>\u00a0in\u00a0<a href=\"https:\/\/www.bnamericas.com\/en\/news\/jamaica-updates-100mw-renewable-energy-call\" target=\"_blank\" rel=\"noopener\">November<\/a>.<\/p>\n<p>\u00a0<\/p>\n<p><a href=\"https:\/\/www.bnamericas.com\/en\/news\/chinese-consortium-lands-us38mn-guyana-solar-contract\" target=\"_blank\" rel=\"noopener\">more<\/a><\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p><em>Image: pexels-hoan-ngo\u0323c-<\/em><\/p>\n<p>\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Guyana Guyana Power and Light\u00a0has awarded work for utility-scale solar capacity and associated battery energy storage program Guysol. The winner of the 18-month contract was a consortium of Chinese companies\u00a0Sumec\u00a0and&#8230;<\/p>\n","protected":false},"author":1091,"featured_media":16287,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"nf_dc_page":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[250],"tags":[244,116],"class_list":["post-33957","post","type-post","status-publish","format-standard","has-post-thumbnail","category-articles","tag-electricity-energy","tag-guyana"],"aioseo_notices":[],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/04\/pexels-hoan-ngo%CC%A3c-6961112-scaled-e1675363854180.jpg?fit=1024%2C683&ssl=1","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p6u9Qa-8PH","jetpack_likes_enabled":true,"jetpack-related-posts":[{"id":30936,"url":"https:\/\/projectcalls.com\/dev\/more-than-20-companies-including-exxon-competing-for-guyanas-oil-marketing-contract\/","url_meta":{"origin":33957,"position":0},"title":"More than 20 companies including Exxon competing for Guyana&#8217;s oil marketing contract","author":"Mayra Bonilla Lopez","date":"November 9, 2023","format":false,"excerpt":"Guyana The Government of Guyana announced that more than 20 companies have submitted bids to compete for a contract to market the country's share of oil production. Among the bidders are Exxon Mobil. The 12-month contract, which allows the country to export its portion of crude produced offshore by a\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2019\/08\/Oil-rig-platform-ocean-sea-Joe-deSousa-flickr.jpg?fit=929%2C573&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2019\/08\/Oil-rig-platform-ocean-sea-Joe-deSousa-flickr.jpg?fit=929%2C573&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2019\/08\/Oil-rig-platform-ocean-sea-Joe-deSousa-flickr.jpg?fit=929%2C573&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2019\/08\/Oil-rig-platform-ocean-sea-Joe-deSousa-flickr.jpg?fit=929%2C573&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":25698,"url":"https:\/\/projectcalls.com\/dev\/guyana-launches-34mwh-tender-for-battery-energy-storage-alongside-solar-pv\/","url_meta":{"origin":33957,"position":1},"title":"Guyana launches 34MWh tender for battery energy storage alongside solar PV","author":"Mayra Bonilla Lopez","date":"January 12, 2023","format":false,"excerpt":"Guyana \u00a0 Guyana, a country on South America\u2019s north coast, has issued an invitation for bids for energy storage projects with a combined capacity of 34MWh. The Guyana Utility Scale Solar Photovoltaic Program (GUYSOL) is now seeking bids for engineering, procurement and construction (EPC) contracts for the eight solar PV\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/04\/pexels-hoan-ngo%CC%A3c-6961112-scaled-e1675363854180.jpg?fit=1024%2C683&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/04\/pexels-hoan-ngo%CC%A3c-6961112-scaled-e1675363854180.jpg?fit=1024%2C683&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/04\/pexels-hoan-ngo%CC%A3c-6961112-scaled-e1675363854180.jpg?fit=1024%2C683&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/04\/pexels-hoan-ngo%CC%A3c-6961112-scaled-e1675363854180.jpg?fit=1024%2C683&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":21168,"url":"https:\/\/projectcalls.com\/dev\/procurement-board-corrects-error-in-bid-for-cost-oil-auditing\/","url_meta":{"origin":33957,"position":2},"title":"Procurement board corrects error in bid for cost oil auditing","author":"Mayra Bonilla Lopez","date":"March 10, 2022","format":false,"excerpt":"Guyana A data entry error resulted in the National Procurement and Tender Administration Board (NPTAB) listing only one of the three companies in a consortium that bid to audit Guyana\u2019s cost oil and the agency\u2019s website has since made a correction to reflect all the companies involved. Following concerns raised\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/03\/pexels-aleks-marinkovic-5213545.jpg?fit=1024%2C674&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/03\/pexels-aleks-marinkovic-5213545.jpg?fit=1024%2C674&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/03\/pexels-aleks-marinkovic-5213545.jpg?fit=1024%2C674&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/03\/pexels-aleks-marinkovic-5213545.jpg?fit=1024%2C674&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":25990,"url":"https:\/\/projectcalls.com\/dev\/guyana-launches-tender-for-33-mw-34-mwh-of-solar-plus-storage\/","url_meta":{"origin":33957,"position":3},"title":"Guyana launches tender for 33 MW\/34 MWh of solar-plus-storage","author":"Michele Marius","date":"January 19, 2023","format":false,"excerpt":"Guyana The government of Guyana and the Inter\u2013American Development Bank (IDB) have jointly launched a tender to deploy 33 MW\/34 MWh of solar-plus-storage capacity. The Guyanese authorities said the tender will be divided into three lots. It will enable the selection of eight PV projects, the government said, without disclosing\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/07\/Solar-panels-wind-mill-energy-electricity-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/07\/Solar-panels-wind-mill-energy-electricity-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/07\/Solar-panels-wind-mill-energy-electricity-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/07\/Solar-panels-wind-mill-energy-electricity-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":24785,"url":"https:\/\/projectcalls.com\/dev\/nptab-defends-bids-for-wales-gas-plant\/","url_meta":{"origin":33957,"position":4},"title":"NPTAB defends bids for Wales gas plant","author":"Mayra Bonilla Lopez","date":"October 27, 2022","format":false,"excerpt":"Guyana The National Procurement and Tender Administration Board (NPTAB) has taken umbrage at criticisms of its prequalification of companies for the construction of the Wales natural gas plant, with officials saying that simply checking the board\u2019s website and those of companies that bid would clear up any doubts. \u201cYou have\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/10\/pexels-kelly-4394362-scaled-e1666942716326.jpg?fit=1024%2C575&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/10\/pexels-kelly-4394362-scaled-e1666942716326.jpg?fit=1024%2C575&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/10\/pexels-kelly-4394362-scaled-e1666942716326.jpg?fit=1024%2C575&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/10\/pexels-kelly-4394362-scaled-e1666942716326.jpg?fit=1024%2C575&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":21389,"url":"https:\/\/projectcalls.com\/dev\/procurement-board-corrects-error-in-bid-for-cost-oil-auditing-2\/","url_meta":{"origin":33957,"position":5},"title":"Procurement board corrects error in bid for cost oil auditing","author":"Mayra Bonilla Lopez","date":"March 24, 2022","format":false,"excerpt":"Guyana \u00a0 A data entry error resulted in the National Procurement and Tender Administration Board (NPTAB) listing only one of the three companies in a consortium that bid to audit Guyana\u2019s cost oil and the agency\u2019s website has since made a correction to reflect all the companies involved. Following concerns\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/03\/pexels-vie-studio-4439425-scaled-e1648207646509.jpg?fit=1024%2C683&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/03\/pexels-vie-studio-4439425-scaled-e1648207646509.jpg?fit=1024%2C683&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/03\/pexels-vie-studio-4439425-scaled-e1648207646509.jpg?fit=1024%2C683&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/03\/pexels-vie-studio-4439425-scaled-e1648207646509.jpg?fit=1024%2C683&ssl=1&resize=700%2C400 2x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts\/33957","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/users\/1091"}],"replies":[{"embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/comments?post=33957"}],"version-history":[{"count":2,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts\/33957\/revisions"}],"predecessor-version":[{"id":33979,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts\/33957\/revisions\/33979"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/media\/16287"}],"wp:attachment":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/media?parent=33957"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/categories?post=33957"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/tags?post=33957"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}