{"id":35014,"date":"2024-07-04T23:30:54","date_gmt":"2024-07-05T04:30:54","guid":{"rendered":"https:\/\/projectcalls.com\/dev?p=35014"},"modified":"2024-07-03T19:14:19","modified_gmt":"2024-07-04T00:14:19","slug":"guyana-launches-tender-for-utility-scale-pv-battery-storage-projects","status":"publish","type":"post","link":"https:\/\/projectcalls.com\/dev\/guyana-launches-tender-for-utility-scale-pv-battery-storage-projects\/","title":{"rendered":"Guyana launches tender for utility-scale PV, battery storage projects"},"content":{"rendered":"<p>Guyana<\/p>\n<p>Bidders are asked to provide qualifications requirements that include business registration or incorporation documents, valid Guyana Revenue Authority and National Insurance Scheme Compliance certificates, value-added tax (VAT) registration certificates for domestic parties, experience, technical ability, and financial capacity. Bidding is scheduled to begin for three projects on Sept. 26.<\/p>\n<p>Guyana\u2019s public utility company\u00a0 (GPL) has opened a\u00a0<a tabindex=\"0\" href=\"https:\/\/idbdocs.iadb.org\/wsdocs\/getdocument.aspx?docnum=EZIDB0000171-1375635338-37974\">tender<\/a>\u00a0for three utility-scale PV and battery storage projects with total power and storage capacities of 15 MWp and 22 MWh, respectively.<\/p>\n<p>The Guyanese government has earned financing under the Guyana-Norway Partnership and intends to apply part of the proceeds to payments under the contracts for engineering, procurement, and construction of the projects, known collectively as the Guyana Utility Scale Solar Photovoltaic Program (GUYSOL).<\/p>\n<p>The financing for the project will be administered in accordance with the policies of the Inter-American Development Bank (IDB), according to information posted by the IDB.<\/p>\n<p>GPL is now inviting sealed bids from eligible and qualified bidders for engineering, procurement, and construction of the three utility-scale, ground-mounted PV plants and battery storage systems.<\/p>\n<p>Bidding will be conducted through the International Competitive Bidding (ICB) procedures specified in the IDB\u2019s Policies for the Procurement of Goods and Works. The tender is open to all bidders from eligible source countries as defined in the Policies. Bidders are asked to provide qualifications requirements that include business registration or incorporation documents, valid Guyana Revenue Authority and National Insurance Scheme Compliance certificates, VAT registration certificates (for domestic parties), experience, technical and financial capacity.<\/p>\n<p>A pre-bid meeting and site visit will be held on Aug. 5 and 6.<\/p>\n<p>Interested parties can purchase a complete set of bidding documents in English from GPL for a non-refundable fee of GYD 20,000 ($95.84).<\/p>\n<p>Bids must be made before Sept. 26, the day opening of bids commences. All bids must be accompanied by a bid security of $250,000 or an equivalent amount in a freely convertible currency.<\/p>\n<p><a href=\"https:\/\/www.pv-magazine.com\/2024\/06\/28\/guyana-launches-tender-for-three-utility-scale-pv-and-battery-storage-projects\/\" target=\"_blank\" rel=\"noopener\">more<\/a><\/p>\n<p>\u00a0<\/p>\n<p>Image: pexels-hilaryh-698485<\/p>\n<p>\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Guyana Bidders are asked to provide qualifications requirements that include business registration or incorporation documents, valid Guyana Revenue Authority and National Insurance Scheme Compliance certificates, value-added tax (VAT) registration certificates&#8230;<\/p>\n","protected":false},"author":1091,"featured_media":35015,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"nf_dc_page":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[250],"tags":[244,116],"class_list":["post-35014","post","type-post","status-publish","format-standard","has-post-thumbnail","category-articles","tag-electricity-energy","tag-guyana"],"aioseo_notices":[],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/07\/pexels-hilaryh-698485-scaled-e1720051881559.jpg?fit=1024%2C643&ssl=1","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p6u9Qa-96K","jetpack_likes_enabled":true,"jetpack-related-posts":[{"id":25698,"url":"https:\/\/projectcalls.com\/dev\/guyana-launches-34mwh-tender-for-battery-energy-storage-alongside-solar-pv\/","url_meta":{"origin":35014,"position":0},"title":"Guyana launches 34MWh tender for battery energy storage alongside solar PV","author":"Mayra Bonilla Lopez","date":"January 12, 2023","format":false,"excerpt":"Guyana \u00a0 Guyana, a country on South America\u2019s north coast, has issued an invitation for bids for energy storage projects with a combined capacity of 34MWh. The Guyana Utility Scale Solar Photovoltaic Program (GUYSOL) is now seeking bids for engineering, procurement and construction (EPC) contracts for the eight solar PV\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/04\/pexels-hoan-ngo%CC%A3c-6961112-scaled-e1675363854180.jpg?fit=1024%2C683&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/04\/pexels-hoan-ngo%CC%A3c-6961112-scaled-e1675363854180.jpg?fit=1024%2C683&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/04\/pexels-hoan-ngo%CC%A3c-6961112-scaled-e1675363854180.jpg?fit=1024%2C683&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/04\/pexels-hoan-ngo%CC%A3c-6961112-scaled-e1675363854180.jpg?fit=1024%2C683&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":25990,"url":"https:\/\/projectcalls.com\/dev\/guyana-launches-tender-for-33-mw-34-mwh-of-solar-plus-storage\/","url_meta":{"origin":35014,"position":1},"title":"Guyana launches tender for 33 MW\/34 MWh of solar-plus-storage","author":"Michele Marius","date":"January 19, 2023","format":false,"excerpt":"Guyana The government of Guyana and the Inter\u2013American Development Bank (IDB) have jointly launched a tender to deploy 33 MW\/34 MWh of solar-plus-storage capacity. The Guyanese authorities said the tender will be divided into three lots. It will enable the selection of eight PV projects, the government said, without disclosing\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/07\/Solar-panels-wind-mill-energy-electricity-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/07\/Solar-panels-wind-mill-energy-electricity-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/07\/Solar-panels-wind-mill-energy-electricity-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/07\/Solar-panels-wind-mill-energy-electricity-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":36024,"url":"https:\/\/projectcalls.com\/dev\/guyana-opens-tender-for-solar-plus-storage-projects-2\/","url_meta":{"origin":35014,"position":2},"title":"Guyana opens tender for solar-plus-storage projects","author":"Mayra Bonilla Lopez","date":"August 29, 2024","format":false,"excerpt":"Guyana Guyana Power and Light, a publicly owned utility, has kicked off a tender to select an engineering, procurement and construction (EPC) contractor for three solar plants with battery energy storage. The deadline for applications is Sept. 26. Guyana Power and Light has launched a tender for an EPC contractor\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/08\/pexels-cristian-rojas-8853536-1-scaled-e1723773146795.jpg?fit=1024%2C684&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/08\/pexels-cristian-rojas-8853536-1-scaled-e1723773146795.jpg?fit=1024%2C684&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/08\/pexels-cristian-rojas-8853536-1-scaled-e1723773146795.jpg?fit=1024%2C684&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/08\/pexels-cristian-rojas-8853536-1-scaled-e1723773146795.jpg?fit=1024%2C684&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":35775,"url":"https:\/\/projectcalls.com\/dev\/guyana-opens-tender-for-solar-plus-storage-projects\/","url_meta":{"origin":35014,"position":3},"title":"Guyana opens tender for solar-plus-storage projects","author":"Mayra Bonilla Lopez","date":"August 15, 2024","format":false,"excerpt":"Guyana Guyana Power and Light, a publicly owned utility, has kicked off a tender to select an engineering, procurement and construction (EPC) contractor for three solar plants with battery energy storage. The deadline for applications is Sept. 26. Guyana Power and Light has launched a tender for an EPC contractor\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/08\/pexels-pixabay-356036-scaled-e1723773103381.jpg?fit=1025%2C674&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/08\/pexels-pixabay-356036-scaled-e1723773103381.jpg?fit=1025%2C674&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/08\/pexels-pixabay-356036-scaled-e1723773103381.jpg?fit=1025%2C674&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/08\/pexels-pixabay-356036-scaled-e1723773103381.jpg?fit=1025%2C674&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":33957,"url":"https:\/\/projectcalls.com\/dev\/chinese-consortium-lands-us38mn-guyana-solar-contract\/","url_meta":{"origin":35014,"position":4},"title":"Chinese consortium lands US$38mn Guyana solar contract","author":"Mayra Bonilla Lopez","date":"May 2, 2024","format":false,"excerpt":"Guyana Guyana Power and Light\u00a0has awarded work for utility-scale solar capacity and associated battery energy storage program Guysol. The winner of the 18-month contract was a consortium of Chinese companies\u00a0Sumec\u00a0and XJ Group, procurement information shows. BNamericas previously reported that eight groups\u00a0had submitted offers\u00a0in the call for eight plants in three\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/04\/pexels-hoan-ngo%CC%A3c-6961112-scaled-e1675363854180.jpg?fit=1024%2C683&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/04\/pexels-hoan-ngo%CC%A3c-6961112-scaled-e1675363854180.jpg?fit=1024%2C683&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/04\/pexels-hoan-ngo%CC%A3c-6961112-scaled-e1675363854180.jpg?fit=1024%2C683&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/04\/pexels-hoan-ngo%CC%A3c-6961112-scaled-e1675363854180.jpg?fit=1024%2C683&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":21156,"url":"https:\/\/projectcalls.com\/dev\/approval-of-guyanas-largest-oil-project-anticipated-in-march-says-vp-jagdeo\/","url_meta":{"origin":35014,"position":5},"title":"Approval of Guyana&#8217;s largest oil project anticipated in March, says VP Jagdeo","author":"Mayra Bonilla Lopez","date":"March 10, 2022","format":false,"excerpt":"Guyana \u00a0 GEORGETOWN, Guyana, (DPI) \u2013\u00a0Vice president Dr Bharrat Jagdeo shared that the government of Guyana is putting all systems in place for the approval of the Yellowtail field development plan (FDP), with completion anticipated for March. Yellowtail is Guyana's fourth and biggest oil project in the Stabroek Block and\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/03\/pexels-tom-fisk-6060191-scaled-e1646951913700.jpg?fit=1024%2C686&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/03\/pexels-tom-fisk-6060191-scaled-e1646951913700.jpg?fit=1024%2C686&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/03\/pexels-tom-fisk-6060191-scaled-e1646951913700.jpg?fit=1024%2C686&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/03\/pexels-tom-fisk-6060191-scaled-e1646951913700.jpg?fit=1024%2C686&ssl=1&resize=700%2C400 2x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts\/35014","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/users\/1091"}],"replies":[{"embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/comments?post=35014"}],"version-history":[{"count":3,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts\/35014\/revisions"}],"predecessor-version":[{"id":35033,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts\/35014\/revisions\/35033"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/media\/35015"}],"wp:attachment":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/media?parent=35014"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/categories?post=35014"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/tags?post=35014"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}