{"id":35262,"date":"2024-07-18T23:01:58","date_gmt":"2024-07-19T04:01:58","guid":{"rendered":"https:\/\/projectcalls.com\/dev?p=35262"},"modified":"2024-07-21T12:45:11","modified_gmt":"2024-07-21T17:45:11","slug":"five-international-companies-pre-qualified-for-spark-programme-2","status":"publish","type":"post","link":"https:\/\/projectcalls.com\/dev\/five-international-companies-pre-qualified-for-spark-programme-2\/","title":{"rendered":"Five international companies pre-qualified for SPARK programme"},"content":{"rendered":"<p>Jamaica<\/p>\n<div>The government has announced that five companies have been shortlisted to bid on the multi-billion-dollar road rehabilitation programme, known as SPARK.<\/div>\n<div><\/div>\n<div>Minister with responsibility for Works, Robert Morgan, says the National Works Agency recently completed the pre-qualification stage of the International Competitive Bidding process.<\/div>\n<div><\/div>\n<div>Minister Morgan says eight companies, including two construction firms from Jamaica, responded to the bid.<\/div>\n<div><\/div>\n<div>\u201cSo far, five international companies have been successful at the pre-qualification stage, and this week, we will be sending out bid proposals to those five pre-qualified enterprise construction companies. These proposals will be for them to bid on the four packages that are across the island. And we expect those bid proposals to be returned by mid August and then we will seek approval from the Public Procurement Commission as well as Cabinet to award contracts by the end of September this year,\u201d he disclosed while speaking during Wednesday\u2019s post Cabinet press briefing.<\/div>\n<div><\/div>\n<div>The five successful bidders are Sinohydro Corporation, China Harbour Engineering Company, Municipal Enterprises of Canada, the UK\u2019s Lagan Aviation and Infrastructure and VINCI Construction Grands Projects out of France.<\/div>\n<div><\/div>\n<div>The Works Minister said, though it is expected that an international company will be the successful bidder, a local company must be involved in the implementation, in keeping with the project arrangement.<\/div>\n<div><\/div>\n<div>Minister Morgan said the contracts are for two years, with an additional year for defects liabilities as well as corrective works in the event of challenges with the completed works.<\/div>\n<div><\/div>\n<div><strong>Priority list\u00a0<\/strong><\/div>\n<div><\/div>\n<div>He added that a priority list of roads has been developed in several constituencies, based on the current consultations.<\/div>\n<div><\/div>\n<div>So far, there have been 24 meetings across 21 constituencies to identify the thoroughfares that are in need of attention.<\/div>\n<div><\/div>\n<div>Mr. Morgan said the target roads are being assessed.<\/div>\n<div><\/div>\n<div>\u201cWe have also sent a list to the National Water Commission to determine the needs and status of waterlines on these roads and preliminary costs will be shared with the CDF (Constituency Development Fund) to determine the final priority list per constituency for the initial $1 million allocation.<\/div>\n<div><\/div>\n<div>\u201cSo it is split into two for the first year \u2013 $150 million for members of Parliament and constituencies based on the consultation, which is about $10 billion and then another $10 billion in the first year for NWA roads, roads that are main roads but are not community roads. And in that vein, the NWA has selected 60 main roads for implementation in this project and these roads will pass through every constituency in keeping with the policy mandate of the SPARK project,\u201d he outlined.<\/div>\n<div><\/div>\n<div><a href=\"https:\/\/radiojamaicanewsonline.com\/local\/five-international-companies-pre-qualified-for-spark-programme\" target=\"_blank\" rel=\"noopener\">more<\/a><\/div>\n<div><\/div>\n<div><\/div>\n<div>Image: pexels-dariabuntaria-267810<\/div>\n<div><\/div>\n<div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Jamaica The government has announced that five companies have been shortlisted to bid on the multi-billion-dollar road rehabilitation programme, known as SPARK. Minister with responsibility for Works, Robert Morgan, says&#8230;<\/p>\n","protected":false},"author":1091,"featured_media":35278,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"nf_dc_page":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[250],"tags":[124,247,158],"class_list":["post-35262","post","type-post","status-publish","format-standard","has-post-thumbnail","category-articles","tag-jamaica","tag-roads-transport","tag-works"],"aioseo_notices":[],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/07\/pexels-dariabuntaria-2678104-scaled-e1721583477683.jpg?fit=1024%2C679&ssl=1","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p6u9Qa-9aK","jetpack_likes_enabled":true,"jetpack-related-posts":[{"id":35011,"url":"https:\/\/projectcalls.com\/dev\/five-international-companies-pre-qualified-for-spark-programme\/","url_meta":{"origin":35262,"position":0},"title":"Five international companies pre-qualified for SPARK programme","author":"Mayra Bonilla Lopez","date":"July 4, 2024","format":false,"excerpt":"Jamaica The government has announced that five companies have been shortlisted to bid on the multi-billion-dollar road rehabilitation programme, known as SPARK. Minister with responsibility for Works, Robert Morgan, says the National Works Agency recently completed the pre-qualification stage of the International Competitive Bidding process. Minister Morgan says eight companies,\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/07\/pexels-yury-kim-181374-585419-scaled-e1720051850498.jpg?fit=1024%2C683&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/07\/pexels-yury-kim-181374-585419-scaled-e1720051850498.jpg?fit=1024%2C683&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/07\/pexels-yury-kim-181374-585419-scaled-e1720051850498.jpg?fit=1024%2C683&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/07\/pexels-yury-kim-181374-585419-scaled-e1720051850498.jpg?fit=1024%2C683&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":35581,"url":"https:\/\/projectcalls.com\/dev\/local-contractors-will-not-be-excluded-from-spark-morgan\/","url_meta":{"origin":35262,"position":1},"title":"Local contractors will not be excluded from SPARK &#8211; Morgan","author":"Mayra Bonilla Lopez","date":"August 1, 2024","format":false,"excerpt":"Jamaica ocal contractors are being assured that they will not be excluded from the procurement process under the Government's $40 billion Shared Prosperity Through Accelerated Improvement (SPARK) programme. The initiative seeks to rehabilitate several of the island\u2019s roadways. Recently, the Incorporated Masterbuilders\u2019 Association of Jamaica (IMAJ) raised serious concerns that\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/08\/Contract-agreement-signature-Pixabay-Pexels.jpeg?fit=1024%2C768&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/08\/Contract-agreement-signature-Pixabay-Pexels.jpeg?fit=1024%2C768&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/08\/Contract-agreement-signature-Pixabay-Pexels.jpeg?fit=1024%2C768&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/08\/Contract-agreement-signature-Pixabay-Pexels.jpeg?fit=1024%2C768&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":24785,"url":"https:\/\/projectcalls.com\/dev\/nptab-defends-bids-for-wales-gas-plant\/","url_meta":{"origin":35262,"position":2},"title":"NPTAB defends bids for Wales gas plant","author":"Mayra Bonilla Lopez","date":"October 27, 2022","format":false,"excerpt":"Guyana The National Procurement and Tender Administration Board (NPTAB) has taken umbrage at criticisms of its prequalification of companies for the construction of the Wales natural gas plant, with officials saying that simply checking the board\u2019s website and those of companies that bid would clear up any doubts. \u201cYou have\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/10\/pexels-kelly-4394362-scaled-e1666942716326.jpg?fit=1024%2C575&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/10\/pexels-kelly-4394362-scaled-e1666942716326.jpg?fit=1024%2C575&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/10\/pexels-kelly-4394362-scaled-e1666942716326.jpg?fit=1024%2C575&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/10\/pexels-kelly-4394362-scaled-e1666942716326.jpg?fit=1024%2C575&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":5615,"url":"https:\/\/projectcalls.com\/dev\/nmia-bids-pushed-back-to-june\/","url_meta":{"origin":35262,"position":3},"title":"NMIA Bids Pushed Back To June","author":"Michele Marius","date":"May 18, 2018","format":false,"excerpt":"The eight investor groups going after the Norman Manley International Airport will be issued with finals bid documents next week, marking a three-month delay that divestment agent Development Bank of Jamaica, DBJ, said was allowed for more due diligence and consultations. DBJ was initially expected to issue the documents in\u2026","rel":"","context":"In &quot;News\/Developments&quot;","block_context":{"text":"News\/Developments","link":"https:\/\/projectcalls.com\/dev\/category\/newsdevelopments\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/05\/Norman-Manley-International-Airport-NMIA-Source-DBJ.jpg?fit=1024%2C585&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/05\/Norman-Manley-International-Airport-NMIA-Source-DBJ.jpg?fit=1024%2C585&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/05\/Norman-Manley-International-Airport-NMIA-Source-DBJ.jpg?fit=1024%2C585&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/05\/Norman-Manley-International-Airport-NMIA-Source-DBJ.jpg?fit=1024%2C585&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":19891,"url":"https:\/\/projectcalls.com\/dev\/govt-retendering-ogle-to-eccles-four-lane-road-project\/","url_meta":{"origin":35262,"position":4},"title":"Gov\u2019t retendering Ogle to Eccles four-lane road project","author":"Mayra Bonilla Lopez","date":"December 16, 2021","format":false,"excerpt":"Guyana With no bids received for the Ogle to Eccles four-lane highway project, government will be retendering with help from India to attract interest from a wider pool of contractors. The project, which is being funded by India\u2019s Exim Bank, has been delayed as a result of the situation. Minister\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/12\/asphalt-g182191173_640.jpg?fit=640%2C392&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/12\/asphalt-g182191173_640.jpg?fit=640%2C392&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/12\/asphalt-g182191173_640.jpg?fit=640%2C392&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":20037,"url":"https:\/\/projectcalls.com\/dev\/three-indian-firms-vying-for-ogle-to-eccles-four-lane-highway-project\/","url_meta":{"origin":35262,"position":5},"title":"Three Indian firms vying for Ogle to Eccles four-lane highway project","author":"Mayra Bonilla Lopez","date":"January 6, 2022","format":false,"excerpt":"Guyana \u00a0 Three Indian companies are vying to construct the much anticipated Ogle to Eccles four-lane highway, which is being funded by a line of credit from the Indian Exim Bank. The bids from the three companies, Afcons, Ashoka Construction Company, and Dineshchandra R. Agrawal Infracon Pvt. Ltd (DRAIPL), submitted\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/08\/pexels-tranmautritam-448828-scaled-e1641392434423.jpg?fit=1024%2C683&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/08\/pexels-tranmautritam-448828-scaled-e1641392434423.jpg?fit=1024%2C683&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/08\/pexels-tranmautritam-448828-scaled-e1641392434423.jpg?fit=1024%2C683&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/08\/pexels-tranmautritam-448828-scaled-e1641392434423.jpg?fit=1024%2C683&ssl=1&resize=700%2C400 2x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts\/35262","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/users\/1091"}],"replies":[{"embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/comments?post=35262"}],"version-history":[{"count":4,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts\/35262\/revisions"}],"predecessor-version":[{"id":35321,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts\/35262\/revisions\/35321"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/media\/35278"}],"wp:attachment":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/media?parent=35262"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/categories?post=35262"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/tags?post=35262"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}