{"id":37196,"date":"2024-11-14T23:06:24","date_gmt":"2024-11-15T04:06:24","guid":{"rendered":"https:\/\/projectcalls.com\/dev?p=37196"},"modified":"2024-11-14T17:09:19","modified_gmt":"2024-11-14T22:09:19","slug":"tepui-admitted-not-having-requisite-experience-but-ended-up-with-865m-pump-station-project","status":"publish","type":"post","link":"https:\/\/projectcalls.com\/dev\/tepui-admitted-not-having-requisite-experience-but-ended-up-with-865m-pump-station-project\/","title":{"rendered":"Tepui admitted not having requisite experience but ended up with $865m pump station project"},"content":{"rendered":"<p>Guyana<\/p>\n<p>In the wake of its investigation of\u00a0 the awarding of a pump station project to Tepui Inc which did not have the requisite experience, the PPC has recommended that evaluators stick rigidly with the evaluation criteria for tenders.<\/p>\n<p>In its summary of findings issued on Tuesday, six months after a complaint by MP David Patterson, the Public Procurement Commission (PPC) recommended that \u201cEvaluators must strictly abide with the express terms of the Evaluation Criteria for the tender being evaluated\u201d. The PPC pointed out that the previous commission had said the Evaluation Committee should not consider evaluation criteria not outlined in the tender documents.<\/p>\n<p>The PPC,\u00a0 chaired by attorney Pauline Chase, said that an Evaluation Committee \u201cdoes not possess the authority, discretion or jurisdiction to vary or (waive)\u00a0 Evaluation Criteria unless expressly provided for in the tender documents\u201d.<span id=\"more-753351\"><\/span><\/p>\n<p>It also recommended that the Evaluation Committee should be \u201cvery meticulous\u201d in its review of bids to ensure that they are evaluated in accordance with the Evaluation Criteria so that the Procurement Act is not breached.<\/p>\n<p>\u201cThe Evaluation Report should give a true and complete account of the evaluation process. Accordingly, it must clearly set out all pertinent matters, including but not limited to, date of completion of the evaluation, analysis of the tenders, whether arithmetic checks were done in accordance with S. 39(4)(b) of the Procurement Act, Cap. 73:05 and whether clarification was sought from any of the bidders and if so the particulars thereof\u201d, the PPC said.<\/p>\n<p>The upshot of the summary of findings is that though Tepui did not comply with the evaluation criteria, a contract has already been signed and the PPC does not have any authority to rescind, recall or alter the contract in any way.<\/p>\n<p>The PPC\u2019s summary of findings is replete with examples of the Evaluation Committee of the National Procurement and Tender Administration Board (NPTAB) bending over backwards to justify not strictly applying the evaluation criteria to Tepui\u2019s bid. One of the key requirements was for Tepui to have had prior experience with a project similar to a pump station. It did not have this and readily admitted it.<\/p>\n<p>However, when questioned by the PPC, the NPTAB said that the work\u00a0 done by Tepui in the less than a year it was in existence was similar to what was required for a pump station.<\/p>\n<p>The PPC noted that Evaluation Criteria No. 8, required the awarded contractor to:\u00a0 \u201cDemonstrate specific construction experience by providing copies of contracts with previous clients that show the bidder has completed one (1) project of similar nature within the past five (5) years. (Similar projects shall include pump stations, sluices and drainage structures)\u201d [emphasis re Bidding Documents].<\/p>\n<p>The PPC said that the record before it\u00a0 reflects that Tepui submitted two contracts under this criterion heading: a contract between it and Hadi\u2019s World Inc. dated March 27th, 2023, for the construction of a concrete wharf at Providence, and\u00a0 a contract between it and the Central Housing and Planning Authority dated February 24th, 2023, for the upgrading of roads in Block 3, Great Diamond.<\/p>\n<p>Further, the List of Current Projects submitted by Tepui under Evaluation Criteria No. 14, gave the status of the aforesaid projects at the time of the bid submission (June 2023) as 30% and 20% completed, respectively.<\/p>\n<p>The commission noting that the works for which the contracts were submitted by Tepui were neither for a \u201cpump station, sluice and or drainage structure\u201d as specified in the Evaluation Criteria nor were any, by Tepui\u2019s own admission, completed, also as required by the Evaluation Criteria, wrote to the NPTAB by on\u00a0 February 6th, 2024 and requested clarification as to the basis on which the Evaluation Committee deemed Tepui as responsive to the said criterion No. 8.<\/p>\n<p>more<\/p>\n<p>\u00a0<\/p>\n<p>image: pexels-introspectivedsgn<\/p>\n<p>\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Guyana In the wake of its investigation of\u00a0 the awarding of a pump station project to Tepui Inc which did not have the requisite experience, the PPC has recommended that&#8230;<\/p>\n","protected":false},"author":1091,"featured_media":33768,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"nf_dc_page":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[250],"tags":[121,116],"class_list":["post-37196","post","type-post","status-publish","format-standard","has-post-thumbnail","category-articles","tag-caribbean","tag-guyana"],"aioseo_notices":[],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/04\/pexels-introspectivedsgn-9216590-scaled-e1713481531966.jpg?fit=1024%2C683&ssl=1","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p6u9Qa-9FW","jetpack_likes_enabled":true,"jetpack-related-posts":[{"id":36654,"url":"https:\/\/projectcalls.com\/dev\/nptab-says-working-to-address-criticisms-by-procurement-commission\/","url_meta":{"origin":37196,"position":0},"title":"NPTAB says working to address criticisms by procurement commission","author":"Mayra Bonilla Lopez","date":"October 10, 2024","format":false,"excerpt":"Guyana Chairman of the NPTAB, Tarachand Balgobind said on Wednesday that he has acknowledged the criticisms of the Public Procurement Commission (PPC) in its summary of findings regarding the tender board\u2019s timely submission of documents and is working to acquire a robust \u201celectronic records\u201d management system. As in\u00a0 the case\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/03\/Procurement-in-handwriting-The-Blue-Diamond-Gallery.jpg?fit=1024%2C683&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/03\/Procurement-in-handwriting-The-Blue-Diamond-Gallery.jpg?fit=1024%2C683&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/03\/Procurement-in-handwriting-The-Blue-Diamond-Gallery.jpg?fit=1024%2C683&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/03\/Procurement-in-handwriting-The-Blue-Diamond-Gallery.jpg?fit=1024%2C683&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":37190,"url":"https:\/\/projectcalls.com\/dev\/ppc-took-eight-months-to-throw-out-complaint-by-r-kissoon-over-di-pumps-bid\/","url_meta":{"origin":37196,"position":1},"title":"PPC took eight months to throw out complaint by R Kissoon over D&#038;I pumps bid","author":"Mayra Bonilla Lopez","date":"November 14, 2024","format":false,"excerpt":"Guyana It took eight months for the PPC to throw out a complaint by R Kissoon Contracting Services over a bid for D&I pumps but more irregularities have surfaced in the tendering system including errors by the evaluation committee and the signing of the disputed contract on January 1st 2023,\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/11\/pexels-arturoaez220-9180894-scaled-e1732828954382.jpg?fit=1024%2C683&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/11\/pexels-arturoaez220-9180894-scaled-e1732828954382.jpg?fit=1024%2C683&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/11\/pexels-arturoaez220-9180894-scaled-e1732828954382.jpg?fit=1024%2C683&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2024\/11\/pexels-arturoaez220-9180894-scaled-e1732828954382.jpg?fit=1024%2C683&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":37619,"url":"https:\/\/projectcalls.com\/dev\/procurement-commission-derelict-in-not-acting-against-tepui-contract-patterson\/","url_meta":{"origin":37196,"position":2},"title":"Procurement commission derelict in not acting against Tepui contract \u2013 Patterson","author":"Mayra Bonilla Lopez","date":"December 15, 2024","format":false,"excerpt":"Guyana The fact that the procurement commission found major breaches in the evaluation process but said it could do nothing about the pump station contract awarded to Tepui Inc., is a dereliction of duty and indication of incompetence says APNU+AFC Member of Parliament David Patterson. \u201cFrom their response alone (the\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/08\/Contract-agreement-signature-Pixabay-Pexels.jpeg?fit=1024%2C768&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/08\/Contract-agreement-signature-Pixabay-Pexels.jpeg?fit=1024%2C768&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/08\/Contract-agreement-signature-Pixabay-Pexels.jpeg?fit=1024%2C768&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/08\/Contract-agreement-signature-Pixabay-Pexels.jpeg?fit=1024%2C768&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":34549,"url":"https:\/\/projectcalls.com\/dev\/afc-hammers-procurement-commissions-inaction-on-belle-vue-pump-station-contract\/","url_meta":{"origin":37196,"position":3},"title":"AFC hammers Procurement Commission\u2019s inaction on Belle Vue pump station contract","author":"Mayra Bonilla Lopez","date":"June 6, 2024","format":false,"excerpt":"Guyana The Alliance for Change today hammered the majority decision of the Public Procurement Commission not to take action in the award of the $865M Belle Vue pump station contract, although several breaches were found in the award of the contract. The contract was awarded to the Tepui company, which\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/03\/pexels-aleks-marinkovic-5213545.jpg?fit=1024%2C674&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/03\/pexels-aleks-marinkovic-5213545.jpg?fit=1024%2C674&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/03\/pexels-aleks-marinkovic-5213545.jpg?fit=1024%2C674&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/03\/pexels-aleks-marinkovic-5213545.jpg?fit=1024%2C674&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":36434,"url":"https:\/\/projectcalls.com\/dev\/ndia-still-to-provide-an-update-on-belle-vue-pump-station-info-for-ppc\/","url_meta":{"origin":37196,"position":4},"title":"NDIA still to provide an update on Belle Vue Pump Station info for PPC","author":"Mayra Bonilla Lopez","date":"September 26, 2024","format":false,"excerpt":"Guyana In the wake of Agriculture Minister Zulfikar Mustapha\u2019s July meeting with the National Drainage and Irrigation Authority (NDIA), Chairman Lionel Wordsworth has yet to provide a promised update on the status of documentation required by the Public Procurement Commission (PPC) on the Belle Vue Pump Station project. Wordsworth, who\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/04\/Irrigation-of-rice-field-using-water-pump.-IRRI-CGIAR-System-Organization-flickr.jpg?fit=1024%2C680&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/04\/Irrigation-of-rice-field-using-water-pump.-IRRI-CGIAR-System-Organization-flickr.jpg?fit=1024%2C680&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/04\/Irrigation-of-rice-field-using-water-pump.-IRRI-CGIAR-System-Organization-flickr.jpg?fit=1024%2C680&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2022\/04\/Irrigation-of-rice-field-using-water-pump.-IRRI-CGIAR-System-Organization-flickr.jpg?fit=1024%2C680&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":37188,"url":"https:\/\/projectcalls.com\/dev\/the-tepui-contract-and-corruption\/","url_meta":{"origin":37196,"position":5},"title":"The Tepui contract and corruption","author":"Mayra Bonilla Lopez","date":"November 14, 2024","format":false,"excerpt":"Guyana \u00a0 Whenever challenged about its longstanding nemesis, corruption, the preferred refrain from the ruling PPP\/C is always for the claimant to present the evidence. That ruse has been employed as the PPP\/C has been well aware that such evidence is difficult to come by and that many who could\u2026","rel":"","context":"In &quot;Articles&quot;","block_context":{"text":"Articles","link":"https:\/\/projectcalls.com\/dev\/category\/articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2023\/02\/Corruption-money-fraudMarco-Verch-Professional-Photographer-flickr.jpg?fit=1024%2C683&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2023\/02\/Corruption-money-fraudMarco-Verch-Professional-Photographer-flickr.jpg?fit=1024%2C683&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2023\/02\/Corruption-money-fraudMarco-Verch-Professional-Photographer-flickr.jpg?fit=1024%2C683&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2023\/02\/Corruption-money-fraudMarco-Verch-Professional-Photographer-flickr.jpg?fit=1024%2C683&ssl=1&resize=700%2C400 2x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts\/37196","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/users\/1091"}],"replies":[{"embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/comments?post=37196"}],"version-history":[{"count":1,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts\/37196\/revisions"}],"predecessor-version":[{"id":37197,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts\/37196\/revisions\/37197"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/media\/33768"}],"wp:attachment":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/media?parent=37196"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/categories?post=37196"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/tags?post=37196"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}