{"id":4785,"date":"2018-03-09T09:56:35","date_gmt":"2018-03-09T14:56:35","guid":{"rendered":"http:\/\/projectcalls.com\/?p=4785"},"modified":"2018-05-24T08:23:17","modified_gmt":"2018-05-24T13:23:17","slug":"saba-starts-preparations-for-big-harbour-project","status":"publish","type":"post","link":"https:\/\/projectcalls.com\/dev\/saba-starts-preparations-for-big-harbour-project\/","title":{"rendered":"Saba Starts Preparations For Big Harbour Project"},"content":{"rendered":"<p>Preparations have started for what will be Saba\u2019s largest infrastructural project ever: the expansion of the harbour at Fort Bay that includes the construction of a second, larger pier.<\/p>\n<p>A so-called sub-soil study, which entails the testing of the sea floor in the direct vicinity of the new pier, is in the planning phase, according to Saba Commissioner Bruce Zagers. This study is important for the breakwater that needs to be constructed to protect the actual pier against the swells. A specialised company needs to carry out this study due to its complexity and specifics. Government has started to look for a company that can carry out the job.<\/p>\n<p>After the sub-soil study, the final design will be made. Witteveen+Bos will be designing the new multi-million pier and the adjacent breakwater. The Dutch engineering company did the design of the current big pier and has the necessary experience. The big pier has withstood all hurricanes, including Irma and Maria.<\/p>\n<p>While in the Netherlands last week and the week before for a series of meetings, the Saba delegation, headed by Commissioner Zagers, met with Witteveen+Bos and the Ministry of Infrastructure and Water Management I&W. \u201cWe want to get everyone on the same page and go for the best possible design,\u201d Zagers told The Daily Herald.<\/p>\n<p>The new pier will be bigger than the current \u201cbig\u201d pier and will replace the actual small pier which has been damaged by the hurricanes and needs urgent replacing. Temporary repairs were made to the small pier following Hurricanes Irma and Maria.<\/p>\n<p>The exact amount of the project is not known at this time because it is still in the planning phase, but for sure it will be the largest in Saba\u2019s history, said Zagers. The project will be financed through the Dutch Government.<\/p>\n<p>\u2026 <a href=\"http:\/\/curacaochronicle.com\/region\/saba-starts-preparations-for-big-harbour-project\/\" target=\"_blank\" rel=\"noopener\">more<\/a><\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p><em>Image:\u00a0 <a href=\"https:\/\/en.wikipedia.org\/wiki\/Saba\" target=\"_blank\" rel=\"noopener\">Wikipedia<\/a><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Preparations have started for what will be Saba\u2019s largest infrastructural project ever: the expansion of the harbour at Fort Bay that includes the construction of a second, larger pier. A&#8230;<\/p>\n","protected":false},"author":19,"featured_media":4788,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"nf_dc_page":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[112],"tags":[144,205,204],"class_list":["post-4785","post","type-post","status-publish","format-standard","has-post-thumbnail","category-newsdevelopments","tag-marineshipping","tag-netherland-antilles","tag-saba"],"aioseo_notices":[],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/03\/View_from_Mt_Scenery_Saba-Wikipedia.jpg?fit=1024%2C768&ssl=1","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p6u9Qa-1fb","jetpack_likes_enabled":true,"jetpack-related-posts":[{"id":5091,"url":"https:\/\/projectcalls.com\/dev\/ecorus-sma-preferred-bidders-in-saba-pv-battery-tender\/","url_meta":{"origin":4785,"position":0},"title":"Ecorus, SMA preferred bidders in Saba PV, battery tender","author":"Michele Marius","date":"April 6, 2018","format":false,"excerpt":"Ecorus Projects BV has been selected as preferred bidder in Saba Electric Company NV\u2019s solar tender, according to a notice on Monday. The company, which supplies electricity on the Saba island in the Dutch Caribbean, sought to award contracts for the engineering, procurement, and construction (EPC) of a photovoltaic (PV)\u2026","rel":"","context":"In &quot;News\/Developments&quot;","block_context":{"text":"News\/Developments","link":"https:\/\/projectcalls.com\/dev\/category\/newsdevelopments\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/01\/power-poles-upper-lines-power-lines-high-voltage-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/01\/power-poles-upper-lines-power-lines-high-voltage-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/01\/power-poles-upper-lines-power-lines-high-voltage-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/01\/power-poles-upper-lines-power-lines-high-voltage-Pixabay-Pexels.jpeg?fit=1024%2C682&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":17906,"url":"https:\/\/projectcalls.com\/dev\/vanterpool-explains-hiring-csc-and-selecting-cruise-pier-developer\/","url_meta":{"origin":4785,"position":1},"title":"Vanterpool explains hiring CSC and selecting cruise pier developer","author":"Mayra Bonilla Lopez","date":"August 12, 2021","format":false,"excerpt":"While denying he commandeered the Cruise Pier Project, former Works Minister under the previous NDP government, Mark Vanterpool conceded that the procurement process to select a developer could have been different. A Public Accounts Committee (PAC) report done in February 2014 stated that Vanterpool along with project consultant Claude Skelton\u2026","rel":"","context":"In &quot;News\/Developments&quot;","block_context":{"text":"News\/Developments","link":"https:\/\/projectcalls.com\/dev\/category\/newsdevelopments\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/08\/pexels-anamul-rezwan-1078884-scaled.jpg?fit=1200%2C754&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/08\/pexels-anamul-rezwan-1078884-scaled.jpg?fit=1200%2C754&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/08\/pexels-anamul-rezwan-1078884-scaled.jpg?fit=1200%2C754&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/08\/pexels-anamul-rezwan-1078884-scaled.jpg?fit=1200%2C754&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2021\/08\/pexels-anamul-rezwan-1078884-scaled.jpg?fit=1200%2C754&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":6390,"url":"https:\/\/projectcalls.com\/dev\/premiers-statement-on-july-18-2018\/","url_meta":{"origin":4785,"position":2},"title":"Premier\u2019s Statement on July 18, 2018","author":"Michele Marius","date":"August 2, 2018","format":false,"excerpt":"Following is the full statement he made today, first delivered on radio: Fellow Citizens, Residents and Friends of Montserrat, wherever you may be, today, 18th July 2018, marks 23 years since the Soufriere Hill volcano erupted and changed the lives of Montserratians forever. Montserrat has been changed, yes, but\u00a0thank God,\u2026","rel":"","context":"In &quot;News\/Developments&quot;","block_context":{"text":"News\/Developments","link":"https:\/\/projectcalls.com\/dev\/category\/newsdevelopments\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/08\/Montserrat-Flag-PonnK-Pixabay.jpg?fit=1024%2C768&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/08\/Montserrat-Flag-PonnK-Pixabay.jpg?fit=1024%2C768&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/08\/Montserrat-Flag-PonnK-Pixabay.jpg?fit=1024%2C768&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/08\/Montserrat-Flag-PonnK-Pixabay.jpg?fit=1024%2C768&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":5561,"url":"https:\/\/projectcalls.com\/dev\/consultants-guiding-ministry-in-cruise-dock-tender\/","url_meta":{"origin":4785,"position":3},"title":"Consultants guiding ministry in cruise dock tender","author":"Michele Marius","date":"May 14, 2018","format":false,"excerpt":"The chief officer in the ministry of tourism told the Public Accounts Committee Thursday that KPMG is guiding government through the procurement process of the cruise ship dock after Cabinet recently gave the green light to press ahead with the controversial development. Stran Bodden told PAC that the overall project\u2026","rel":"","context":"In &quot;News\/Developments&quot;","block_context":{"text":"News\/Developments","link":"https:\/\/projectcalls.com\/dev\/category\/newsdevelopments\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/05\/aidaluna-cruise-ship-port-berth-beejees-Pixabay.jpg?fit=1024%2C682&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/05\/aidaluna-cruise-ship-port-berth-beejees-Pixabay.jpg?fit=1024%2C682&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/05\/aidaluna-cruise-ship-port-berth-beejees-Pixabay.jpg?fit=1024%2C682&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/05\/aidaluna-cruise-ship-port-berth-beejees-Pixabay.jpg?fit=1024%2C682&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":7747,"url":"https:\/\/projectcalls.com\/dev\/cig-cuts-deal-for-port-with-cruise-lines\/","url_meta":{"origin":4785,"position":4},"title":"CIG cuts deal for port with cruise lines","author":"Michele Marius","date":"December 27, 2018","format":false,"excerpt":"(CNS):\u00a0Royal Caribbean Cruises and Carnival Corporation have both made financial commitments towards the Cayman Islands\u2019 controversial cruise berthing project, government has revealed. The tourism ministry said\u00a0it is now in a position to issue the final tender documents to the shortlisted bidders, only one of which is partnered with the two\u2026","rel":"","context":"In &quot;News\/Developments&quot;","block_context":{"text":"News\/Developments","link":"https:\/\/projectcalls.com\/dev\/category\/newsdevelopments\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/05\/aidaluna-cruise-ship-port-berth-beejees-Pixabay.jpg?fit=1024%2C682&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/05\/aidaluna-cruise-ship-port-berth-beejees-Pixabay.jpg?fit=1024%2C682&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/05\/aidaluna-cruise-ship-port-berth-beejees-Pixabay.jpg?fit=1024%2C682&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2018\/05\/aidaluna-cruise-ship-port-berth-beejees-Pixabay.jpg?fit=1024%2C682&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":2928,"url":"https:\/\/projectcalls.com\/dev\/pm-there-was-a-bidding-process-for-bhs-2nd-cruise-pier\/","url_meta":{"origin":4785,"position":5},"title":"PM: There Was A Bidding Process For BHS, 2nd Cruise Pier","author":"Project Calls","date":"August 17, 2017","format":false,"excerpt":"St. Kitts and Nevis (WINN): In response to the question if there was a bidding process for certain capital projects such as the new Basseterre High School, the second cruise pier and National Heroes Park, Prime Minister Dr. Timothy Harris said the government has followed all of the rules relating\u2026","rel":"","context":"In &quot;News\/Developments&quot;","block_context":{"text":"News\/Developments","link":"https:\/\/projectcalls.com\/dev\/category\/newsdevelopments\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2017\/08\/cruise-ship-cruiser-cruise-ship-Pixabay.jpeg?fit=1024%2C681&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2017\/08\/cruise-ship-cruiser-cruise-ship-Pixabay.jpeg?fit=1024%2C681&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2017\/08\/cruise-ship-cruiser-cruise-ship-Pixabay.jpeg?fit=1024%2C681&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/projectcalls.com\/dev\/wp-content\/uploads\/2017\/08\/cruise-ship-cruiser-cruise-ship-Pixabay.jpeg?fit=1024%2C681&ssl=1&resize=700%2C400 2x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts\/4785","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/comments?post=4785"}],"version-history":[{"count":2,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts\/4785\/revisions"}],"predecessor-version":[{"id":4789,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/posts\/4785\/revisions\/4789"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/media\/4788"}],"wp:attachment":[{"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/media?parent=4785"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/categories?post=4785"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projectcalls.com\/dev\/wp-json\/wp\/v2\/tags?post=4785"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}